Guyed tower description
X.Y. Tower is a leading manufacturer of all-welded lattice guyed towers for the wireless markets. We offer an extensive line of guyed towers, are able to accommodate most loading and wind speed requirements.
Our Advantage
Our engineering team will analyze the terrain conditions at the site with the requested antenna loading to ensure that local wind speed and ice conditions are met.
Guyed towers, because they require larger parcels, are ideal for rural customers who need maximum height and economical construction costs. By custom engineering each tower, X.Y. Tower design team is able to produce the most cost effective and efficient guyed tower structure for your needs.
Product name | guy towers |
Brand | X.Y. Tower |
Nominal height | 5-100m or customized |
platform | 1-4 layer or customized |
Max wind speed | 120km/h or customized |
Lifetime | More than 30 years |
Main components | Angle steel communication tower includes tower foot, tower body , working platform, rest platform, antenna bracket, ladder, cable tray, lightning rod |
Production standard | GB/T2694-2018 or customer required |
Raw Material | Q255B/Q355B/Q420B/Q460B |
Raw Material standard | GB/T700-2006,ISO630-1995;GB/T1591-2018;GB/T706-2016 or Customer Required |
Thickness | 1mm to 45mm |
Production Process | Raw material test → Cutting →Molding or bending →Verification of dimensions →Flange/Parts welding →Calibration → Hot Galvanized →Recalibration →Packages→ shipment |
Welding standard | AWS D1.1 |
Surface treatment | Hot dip galvanized |
Galvanized standard | ISO1461 ASTM A123 |
Color | Customized |
Fastener | GB/T5782-2000; ISO4014-1999 or Customer Required |
Bolt performance rating | 4.8;6.8;8.8 |
Spare Parts | 5% bolts will be delivered |
Certificate | ISO9001:2015 |
Capacity | 30,000 tons/ year |
Time to Shanghai Port | 5-7 days |
Delivery Time | Usually within 20 days depends on demand quantity |
size and weight tolerance | 1% |
minimum order quantity | 1 set |
TESTS
X.Y. Tower has a very strict test protocol to ensure all products we fabricate is quality. The following process is applied in our production flow.
Sections and Plates
1. Chemical composition (Ladle Analysis)
2. Tensile Tests
3. Bend Tests
Nuts and Bolts
1. Proof Load test
2. Ultimate Tensile Strength test
3. Ultimate tensile strength test under eccentric load
4. Cold bend test
5. Hardness test
6. Galvanizing test
All the test data are recorded and will be reported to the management. If any flaws are found, the product will be repaired or scraped directly.
Hot-dip galvanizing
Quality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas.
Galvanized standard: ISO:1461-2002.
Item |
Thickness of zinc coating |
Strength of adhesion |
Corrosion by CuSo4 |
Standard and requirement |
≧86μm |
Zinc coat not be stripped and raised by hammering |
4 times |
Free prototype tower assembly service
prototype tower assembly is a very traditional but effective way to inspect whether the detail drawing is correct.
In some cases, clients still want to do prototype tower assembly to ensure the detail drawing and fabrication is OK. Hence, we still provide prototype tower assembly service for free to customers.
In prototype tower assembly service, X.Y. Tower makes commitment:
• For each member, the length, position of holes and interface with other members will be checked accurately for proper fitness;
• Quantity of each member and bolts will be carefully checked from the bill of materials when assembling the prototype;
• Drawings and bill of materials, sizes of bolts, fillers etc. will be revised if any mistake is found.
Customer visit service
We are so glad that our clients to visit our factory and inspect the product. It is a great chance for both sides to know each other better and strengthen cooperation.For our clients, we will receive you at Airport and provide 2-3 days accommodation.
Package and shipment
Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.
All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.
Shipment
Normally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.
For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation.