• bg1

To ensure the safety and stability of the tower. After the construction of the iron tower is completed, a series of tests and inspections are carried out to verify the quality of its design and construction and to ensure that it complies with the relevant standards and specifications. The process of test tower includes comprehensive testing and evaluation of the tower’s structure, materials, welding quality, anti-corrosion treatment and other aspects.

Today, we conducted a trial assembly of the 50 meter 3 leged communication tower of the Congo customer. No problems were found in the trial assembly. This means that the goods will be delivered to customers soon and we hope they are satisfied with our products.  We look forward to longer term cooperation with them.


Post time: Jul-17-2024

Send your message to us:

Write your message here and send it to us