• bg1

High Quality Crossing Tower Factory – lightning rod for substation – X.Y. Tower


Product Detail

Product Tags

Related Video

Feedback (2)

To be a result of ours specialty and repair consciousness, our corporation has won an excellent reputation amongst customers all around the entire world for Monopole Tower, Power Towers, Radio Towers, Our clients mainly distributed in the North America, Africa and Eastern Europe. we can supply high quality products with the very competitive price.
High Quality Crossing Tower Factory – lightning rod for substation – X.Y. Tower Detail:

lightning rod for substation

Except the typical transmission line towers and telecom towers, we also provide some other steel structure products such as watch tower for military, lattice tower for railway electrical systems, lamp pole, pipe rack bracket etc.

As the member of steel structure manufacturers association of Sichuan province, X.Y. Tower also have much experience in variety of steel structures special all kinds of metal supports. We commit that these steel structures are in compliance with the highest quality standards of the industry and are constructed to precision to meet the operational requirements of our clients.

Product name other towers& steel structures
Brand X.Y. Tower
Nominal height 5-100m or customized
platform 1-4 layer or customized
Max wind speed 120km/h or customized
Lifetime More than 30 years
Main components Angle steel communication tower includes tower foot, tower body , working platform, rest platform, antenna bracket, ladder, cable tray, lightning rod
Production standard GB/T2694-2018 or customer required
Raw Material Q255B/Q355B/Q420B/Q460B
Raw Material standard GB/T700-2006,ISO630-1995;GB/T1591-2018;GB/T706-2016 or Customer Required
Thickness 1mm to 45mm
Production Process Raw material test → Cutting →Molding or bending →Verification of dimensions →Flange/Parts welding →Calibration → Hot Galvanized →Recalibration →Packages→ shipment
Welding standard AWS D1.1
Surface treatment Hot dip galvanized
Galvanized standard ISO1461 ASTM A123
Color Customized
Fastener GB/T5782-2000; ISO4014-1999 or Customer Required
Bolt performance rating 4.8;6.8;8.8
Spare Parts 5% bolts will be delivered
Certificate ISO9001:2015
Capacity 30,000 tons/ year
Time to Shanghai Port 5-7 days
Delivery Time Usually within 20 days depends on demand quantity
size and weight tolerance 1%
minimum order quantity 1 set

TESTS

X.Y. Tower has a very strict test protocol to ensure all products we fabricate is quality. The following process is applied in our production flow.

Sections and Plates

1. Chemical composition (Ladle Analysis)

2. Tensile Tests

3. Bend Tests

Nuts and Bolts

1. Proof Load test

2. Ultimate Tensile Strength test

3. Ultimate tensile strength test under eccentric load

4. Cold bend test

5. Hardness test

6. Galvanizing test

All the test data are recorded and will be reported to the management. If any flaws are found, the product will be repaired or scraped directly.

detail (4)
detail (8)

Hot-dip galvanizing

Quality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas.

Galvanized standard: ISO:1461-2002.

Item

Thickness of zinc coating

Strength of adhesion

Corrosion by CuSo4

Standard and requirement

≧86μm

Zinc coat not be stripped and raised by hammering

4 times

detail (3)
detail (2)

Free prototype tower assembly service

prototype tower assembly is a very traditional but effective way to inspect whether the detail drawing is correct.

In some cases, clients still want to do prototype tower assembly to ensure the detail drawing and fabrication is OK. Hence, we still provide prototype tower assembly service for free to customers.

In prototype tower assembly service, X.Y. Tower makes commitment:

• For each member, the length, position of holes and interface with other members will be checked accurately for proper fitness;

• Quantity of each member and bolts will be carefully checked from the bill of materials when assembling the prototype;

• Drawings and bill of materials, sizes of bolts, fillers etc. will be revised if any mistake is found.

detail

Customer visit service

We are so glad that our clients to visit our factory and inspect the product. It is a great chance for both sides to know each other better and strengthen cooperation.For our clients, we will receive you at Airport and provide 2-3 days accommodation.

detail (1)

Package and shipment

Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.

All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.

IMG_47591
IMG_47791
IMG_48331

Shipment

Normally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.

For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation.

factory-17
factory-22
factory-32
IMG_4732
IMG_47421
IMG_47501


Product detail pictures:

High Quality Crossing Tower Factory –  lightning rod for substation – X.Y. Tower detail pictures


Related Product Guide:

We know that we only thrive if we can guarantee our combined price competiveness and quality advantageous at the same time for High Quality Crossing Tower Factory – lightning rod for substation – X.Y. Tower , The product will supply to all over the world, such as: European, Uganda, Mumbai, Customer satisfaction is our first goal. Our mission is to pursue the superlative quality, making continual progress. We sincerely welcome you to make progress hand in hand with us, and construct a prosperous future together.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Frances from Sydney - 2017.11.20 15:58
    The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Donna from Mongolia - 2018.09.12 17:18

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us