• bg1

China High Quality Electric Transmission Tower Factory – 132kV double cirrcuit straight tower – X.Y. Tower


Product Detail

Product Tags

Related Video

Feedback (2)

Our pursuit and corporation aim should be to "Always satisfy our consumer requirements". We carry on to build and style and design remarkable quality items for both our outdated and new clients and reach a win-win prospect for our clients at the same time as us for Grid Substation, 3 Legged Tower, Electrical Power Pole, Currently, we are wanting ahead to even bigger cooperation with abroad customers according to mutual positive aspects. Be sure to sense free to contact us for more details.
China High Quality Electric Transmission Tower Factory – 132kV double cirrcuit straight tower – X.Y. Tower Detail:

Products Available at X.Y. Tower

●Substation structures

Transmission Line Towers

●Telecom Towers

●Poles

●Perforated & Ladder Type Cable Trays

●Earthing Materials (Strips)

●other kinds of steel structures

Tower description

Transmission tower is a tall structure, usually a steel lattice tower, use to support an overhead power line. We render these products with the help of

diligent workforce having vast experience in this field. We go through detailed line survey, route maps, spotting of towers, chart structure and technique document while providing these products.

Our product covers the 11kV to 500kV while include different tower type for example suspension tower, strain tower, angle tower, end tower etc.

Additionally, we still have a vast designed tower type and design service to be offered while if clients have no drawings.

Product name Transmission line tower
Brand XY Towers
Voltage grade 110/132kV
Nominal height 12-45m
Numbers of bundle conductor 1-4
High-low voltage on the same tower up 110/132kV down 33/35kV
Wind speed 120km/h
Lifetime More than 30 years
Production standard GB/T2694-2018 or customer required
Raw Material Q255B/Q355B/Q420B/Q460B
Raw Material standard GB/T700-2006,ISO630-1995;GB/T1591-2018;GB/T706-2016 or Customer Required
Thickness angel steel L40*40*3-L250*250*25; Plate 5mm-80mm
Production Process Raw material test → Cutting →Molding or bending →Verification of dimensions →Flange/Parts welding →Calibration → Hot Galvanized →Recalibration →Packages→ shipment
Welding standard AWS D1.1
Surface treatment Hot dip galvanized
Galvanized standard ISO1461 ASTM A123
Color Customized
Fastener GB/T5782-2000; ISO4014-1999 or Customer Required
Bolt performance rating 4.8;6.8;8.8
Spare Parts 5% bolts will be delivered
Certificate ISO9001:2015
Capacity 30,000 tons/ year
Time to Shanghai Port 5-7 days
Delivery Time Usually within 20 days depends on demand quantity
size and weight tolerance 1%
minimum order quantity 1 set

TESTS

X.Y. Tower has a very strict test protocol to ensure all products we fabricate is quality. The following process is applied in our production flow.

Sections and Plates

1. Chemical composition (Ladle Analysis)

2. Tensile Tests

3. Bend Tests

Nuts and Bolts

1. Proof Load test

2. Ultimate Tensile Strength test

3. Ultimate tensile strength test under eccentric load

4. Cold bend test

5. Hardness test

6. Galvanizing test

All the test data are recorded and will be reported to the management. If any flaws are found, the product will be repaired or scraped directly.

detail (4)
detail (8)

Hot-dip galvanizing

Quality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas.   

Galvanized standard: ISO:1461-2002.

Item

Thickness of zinc coating

Strength of adhesion

Corrosion by CuSo4

Standard and requirement

≧86μm

Zinc coat not be stripped and raised by hammering

4 times

detail (3)
detail (2)

Quality Commitment

In order to keep providing quality products, ensuring every pieces of products are perfect. We strictly inspect the process from the raw material purchasing to the final shipment and all steps are in charge by professional technicians. The production workers and QC engineers sign the Quality Assurance Letter with company. They promise they will be responsible to their job and products they manufacture should be quality.

X.Y. Tower values the quality of our products very much. Here, we make a promise:

1. The products of our factory are strict accordance with customer’ requirements and national standard GB/T2694-2018《Technical Conditions for Manufacturing Transmission Line Towers》,DL/T646-1998《Technical Conditions for Manufacturing Transmission Line Steel Pipe Poles》and ISO9001 -2015 quality management system. 

2. For the special requirements of the clients, the technical department of our factory will make drawings for customers. The customer should confirm the drawing and technical information are correct or not, then the production process shall be taken.

3. The quality of raw materials is significant for the towers. X.Y. Tower purchases raw materials from well-established companies and state-own companies. We also do physical and chemical experiment of the raw materials to make sure that the quality of raw materials must meet national standards or requirements of client. All the raw material of our company has product qualification certificate from steel- make company, while we make a detail record about where the raw material of product come from. 

Customer visit service

We are so glad that our clients to visit our factory and inspect the product. It is a great chance for both sides to know each other better and strengthen cooperation.For our clients, we will receive you at Airport and provide 2-3 days accommodation.

detail (1)

Package and shipment

Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.

All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.

IMG_4759
IMG_4779
IMG_4833

Shipment

Normally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.

For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation. 

factory-(1)
factory-(2)
factory-(3)
IMG_4732
IMG_4742
IMG_4750


Product detail pictures:

China High Quality Electric Transmission Tower Factory –  132kV double cirrcuit straight tower – X.Y. Tower detail pictures


Related Product Guide:

No matter new shopper or old customer, We believe in very long expression and dependable relationship for China High Quality Electric Transmission Tower Factory – 132kV double cirrcuit straight tower – X.Y. Tower , The product will supply to all over the world, such as: Mecca, South Korea, Madras, We have exported our products all over the world, especially the USA and European countries. Furthermore, all of our products are manufactured with advanced equipment and strict QC procedures to ensure high quality.If you are interested in any of our products, please don't hesitate to contact us. We will try our best to meet your needs.
  • This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Christopher Mabey from India - 2017.01.28 18:53
    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Christopher Mabey from Israel - 2017.09.16 13:44

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us