• bg1

China Cheap Construction Pole Manufacturers – 33kV double circuit transmission line tower – X.Y. Tower


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" will be the persistent conception of our company to the long-term to establish together with customers for mutual reciprocity and mutual gain for Distribution Substation, 5g Towers, Steel Tower, As a key enterprise of this industry, our corporation makes attempts to become a leading supplier, depending on the faith of expert excellent & throughout the world assistance.
China Cheap Construction Pole Manufacturers – 33kV double circuit transmission line tower – X.Y. Tower Detail:

Our advantage

We hold expertise in the design and fabrication of transmission line tower that are successful in serving the requirements of electrical industries. These transmission line towers are manufactured as per the design requirements of our clients and are subjected to rigid quality inspection to ensure zero defects and optimum functionality.

●8000 Sq. Meters of Workshop with Cranes.

●Adequate Storage Yard and package palace.

●experienced Engineers and Qualified Workers.

●High Customer Retention Rate.

●Producing Quality Products at Competitive Rates Ensuring.

●Timely Deliveries.

Tower description

Product name Transmission line tower
Brand XY Towers
Voltage grade 33/35kV
Nominal height 9-36m
Numbers of bundle conductor 1-4
High-low voltage on the same tower up 33/35kV down 10kV
Wind speed 120km/h
Lifetime More than 30 years
Production standard GB/T2694-2018 or customer required
Raw Material Q255B/Q355B/Q420B/Q460B
Raw Material standard GB/T700-2006,ISO630-1995;GB/T1591-2018;GB/T706-2016 or Customer Required
Thickness angel steel L40*40*3-L250*250*25; Plate 5mm-80mm
Production Process Raw material test → Cutting →Molding or bending →Verification of dimensions →Flange/Parts welding →Calibration → Hot Galvanized →Recalibration →Packages→ shipment
Welding standard AWS D1.1
Surface treatment Hot dip galvanized
Galvanized standard ISO1461 ASTM A123
Color Customized
Fastener GB/T5782-2000; ISO4014-1999 or Customer Required
Bolt performance rating 4.8;6.8;8.8
Spare Parts 5% bolts will be delivered
Certificate ISO9001:2015
Capacity 30,000 tons/ year
Time to Shanghai Port 5-7 days
Delivery Time Usually within 20 days depends on demand quantity
size and weight tolerance 1%
minimum order quantity 1 set

TESTS

Usually we take physical test & chemical test,below is the test process and equipments.

Physical Test:Hydraulic Univerasl Testing Furnace & Hardness tester

Chemical

Chemical Test: Liquid Dispensing →Digital Display Spectrophotometer→Analytical Balance →Microcomputer Carbon And Sulfur Analyzer

image1
image2

300J impact testing machine picture

image3
image4

Impact test low temperature tank

image5

HR-150A Rockwell Hardness Tester

image6

JUT600 digital ultrasonic flaw detector TG328A

image7

Analytical Balances


Product detail pictures:

China Cheap Construction Pole Manufacturers –  33kV double circuit transmission  line tower – X.Y. Tower detail pictures


Related Product Guide:

To meet the customers' over-expected pleasure , we have now our solid crew to supply our greatest all round assistance which includes marketing, sales, planning, production, top quality controlling, packing, warehousing and logistics for China Cheap Construction Pole Manufacturers – 33kV double circuit transmission line tower – X.Y. Tower , The product will supply to all over the world, such as: Ireland, Lyon, Australia, We warmly welcome your patronage and will serve our clients both at home and abroad with products and solutions of superior quality and excellent service geared to the trend of further development as always. We believe you will benefit from our professionalism soon.
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Carey from Russia - 2018.12.28 15:18
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Andy from Grenada - 2018.09.23 18:44

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us