12m telecommunication tower adjustment
In order to ensure the normal operation of the wireless communication system, the communication antenna is generally placed at a point to increase the signal coverage radius of the communication antenna to achieve the desired communication effect. In urban residential buildings, office buildings, and office buildings to build communication base stations, communication antennas are generally used to increase the height of antennas, antenna poles or antenna towers, so the antenna heightening has an important role in the communication network system. The national standard communication sold by Xiangyue Tower Over the years, the tower and antenna booster series products have received unanimous praise and praise from China Mobile, China Unicom, and China Telecom. The elevated rack produced by Xiangyue enjoys a high reputation in the industry.
Height: 6-15 meters
1. Lattice configuration
2. 3 legged or 4 legged structures
3. Leg and bracing consist of pipe or angular section
4. The base width is of minimum dimension since the structure is roof mounted
5. The base of the tower is mounted on concrete or steel frame (consists of I-beams or inverted I-beams) and the frame fixed with the roof existing concrete columns/ pedestal
TESTS
X.Y. Tower has a very strict test protocol to ensure all products we fabricate is quality. The following process is applied in our production flow.
Sections and Plates
1. Raw Material Angle for Telecom Steel Tower Chemical composition
2. Tensile Tests
3. Bend Tests
1. Proof Load test
2. Ultimate Tensile Strength test
3. Ultimate tensile strength test under eccentric load
4. Cold bend test
5. Hardness test
6. Lattice Steel Tower Galvanizing test
All the test data are recorded and will be reported to the management. If any flaws are found, the product will be repaired or scraped directly.
Hot-dip galvanizing
Quality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas.
Galvanized standard: ISO:1461-2002.
Item |
Thickness of zinc coating |
Strength of adhesion |
Corrosion by CuSo4 |
Standard and requirement |
≧86μm |
Zinc coat not be stripped and raised by hammering |
4 times |
Free prototype tower assembly service
prototype tower assembly is a very traditional but effective way to inspect whether the detail drawing is correct.
In some cases, clients still want to do prototype tower assembly to ensure the detail drawing and fabrication is OK. Hence, we still provide prototype tower assembly service for free to customers.
In prototype tower assembly service, X.Y. Tower makes commitment:
• For each member, the length, position of holes and interface with other members will be checked accurately for proper fitness;
• Quantity of each member and bolts will be carefully checked from the bill of materials when assembling the prototype;
• Drawings and bill of materials, sizes of bolts, fillers etc. will be revised if any mistake is found.
Package and shipment
Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.
All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.
Shipment
Normally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.
For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation.
15184348988